BUDGET BIDDING DOCUMENTS

INSTRUCTIONS TO PROSPECTIVE BIDDERS
FOR
PROJECT NAME
PROJECT ADDRESS

 

BUDGET BID DOCUMENTS
The enclosed documents are submitted in order to obtain a budget bid. Your response will assist us in controling the scope of the project prior to the production of the actual contract documents and will, addditionaly, allow us an opportunity to interview prospective contractors prior to the commencement of the final drafting and bidding process.

BIDDER'S REPRESENTATION
Each Contractor, in helping us with this process is encouraged to visit the site and familiarize himself with all conditions on or adjacent to the site, under which the work is to be performed.

QUESTIONS
After examining the accompanying documents, you are encouraged to notify the Designer of any discrepancies in, or omissions to any of the documents or any un anticipated site conditions which may adversly impact our proposal. All requests for clarification, updates and additional information should be addressed to the designer and not the owner. This last insures that all bidders will be operating with the same information since it enables us to disseminate the response material in the same fashion to all concearned.

COMPLETENESS OF PROPOSALS
The Proposal Prices shall be for the work as indicated in the Specifications, if included, and/or shown on the Drawings as well as any work indicated or reasonably inferable from any of the Documents provided. Such proposal price(s) shall address all reasonably anticipatable costs , including but not limited to overhead, overtime labor, profit, applicable taxes and insurance.

FORM OF PROPOSAL
Proposals should be submitted with the Bidder's name and address or letterhead in the form indicated in the "Requested Form of Proposal". A more detailed budget form is also attached to assist you in understanding which items we are hoping to pin down with this exercise.
Please send the budget bids to:


   SASQUA ASSOCIATES
   POST OFFICE BOX 307
   GREENS FARMS, CONN. 06436-0307

               ATTN.: G. ROGER CLEMENTS

SUBCONTRACTORS
It would be helpful if you could list in your proposal those portions of the work that you plan to subcontract.

SUBSTITUTIONS
The Contractor is encouraged to substitute products which he feels will result in cost savings to the Owner or a higher quality of Construction within the same price range as for the products called out in the submitted material.

CONSIDERATION OF BUDGET NUMBERS
The purpose of this preliminary bid approach is twofold:
1. To allow the homeowner (and the Designer if applicable) to familiarize themselves with the prospective contractors.
2. To asign some preliminary cost figures to the proposed project that will assist us in the finilization of the scope of the project and help us avoid creating a set of contract documents which , when put out for bid, may have only the remotest relationship to the actual available budget.

POST PROPOSAL INFORMATION
It is the usual course of events that subsequent to the return of the requested information we will sit down with you and hone the proposal and try and address any areas where their may be a lack of clarity or where alternate solutions may serve the owner best in trying to undertake this project. Since we have always maintained that the "fit" is just as, if not more, important than the actual numbers this part of the process serves as much more than merely an expectation management session.

 

SECTION 00300
FORM

REQUESTED FORM OF PROPOSAL
Proposals shall be submitted with the respondants name and address in the following form:

Date_____________

Sasqua Associates
Post Office Box 307
Greens Farms, Conn. 06436-0307

Attention: G. Roger Clements

Re: ______________________ PROJECT

Gentlemen:

We have reviewed the submitted material and in our oppinion a reasonable PRELIMINARY BUDGET NUMBER for the project at hand would be:

______________________________________________________________________Dollars ($______________)

IT IS TO BE REALIZED THAT THIS IS A ROUGH ESTIMATE AND IS FOR BUDGETING AND CONTRACT DEVELOPMENT PURPOSES ONLY AND IS NOT A FINAL CONTRACT OR BID NUMBER.

The proposal has been preliminarily broken down as follows:

DIVISION 1,        GENERAL CONDITIONS                                                                                $_______________

DIVISION 2,        DEMOLITION                                                                                                   $_______________

                              SITEWORK                                                                                                       $_______________

DIVISION 3,         CONCRETE                                                                                                      $_______________

DIVISION 4,         MASONRY                                                                                                       $_______________

DIVISION 5,         STRUCTURAL METAL                                                                                    $_______________

                              ORNAMENTAL METAL                                                                                  $_______________

DIVISION 6,         ROUGH CARPENTRY                                                                                     $_______________

                              FINISH CARPENTRY                                                                                       $_______________

                              ARCHITECTURAL WOODWORK                                                                   $_______________

                              CUSTOM CABINETRY                                                                                     $_______________

DIVISION 7,         BUILDING INSULATION                                                                                 $_______________

                              SEALANTS AND CAULKING                                                                          $_______________

                              ROOF                                                                                                                  $_______________

                              ROOF ACCESSORIES                                                                                      $_______________

DIVISION 8,        DOORS AND HARDWARE                                                                               $_______________

                             WINDOWS                                                                                                          $_______________

DIVISION 9,        GYPSUM WALLBOARD                                                                                   $_______________

                              CERAMIC TILE                                                                                                  $_______________

                              FLOORING                                                                                                        $_______________

                              PAINTING                                                                                                          $_______________

DIVISION 10,       SPECIALTIES                                                                                                    $_______________

                              TOILET AND BATH ACCESSORIES                                                               $_______________

DIVISION 11,       RESIDENTIAL EQUIPMENT                                                                            $_______________

                               FOOD SERVICE EQUIPMENT                                                                        $_______________

DIVISION 12,        FURNISHINGS                                                                                                 $_______________

                               CARPET                                                                                                             $_______________

DIVISION 13,        SPECIAL CONSTRUCTION                                                                            $_______________

                               PREFABRICATED STRUCTURES                                                                    $_______________

                               SWIMMING POOL                                                                                            $_______________

DIVISION 14,        CONVEYING SYSTEMS                                                                                  $_______________

DIVISION 15,        PLUMBING                                                                                                        $_______________

                               HEATING                                                                                                            $_______________

                             

                               AIR CONDITIONING                                                                                        $_______________

DIVISION 16,        ELECTRICAL                                                                                                     $_______________

OVERHEAD, CONTINGENCY AND PROFIT                                                                                $_______________

TOTAL ESTIMATED SUM                                                                                                                $_______________

Taxes:
Are estimated and included above but not exact. (Include in Divison 1)

Fees and Permits:
The cost of all anticipated fees and permits are included in this proposal as an "allowance" only.
The anticipated fees and permits are included above but not exact. (Include in Divison 1)

Alternates:
List alternates here.

Subcontractors:
Areas to be subcontracted would be:
(List areas that are proposed to be subbed out here. Names are not required at this time.)

****END OF SECTION****